| 21.10.2026 | ↓ | 63 500 000 ₸ | −2 000 000 ₸ (−3%) |
| 20.10.2026 | ↑ | 65 500 000 ₸ | +2 000 000 ₸ (+3%) |
| 18.10.2026 | ↓ | 63 500 000 ₸ | −2 499 999 ₸ (−4%) |
| 11.10.2026 | ↓ | 65 999 999 ₸ | −5 000 000 ₸ (−7%) |
| 31.08.2026 | ↓ | 70 999 999 ₸ | −2 500 001 ₸ (−3%) |
| 25.08.2026 | ↓ | 73 500 000 ₸ | −1 499 999 ₸ (−2%) |
| 24.08.2026 | ↓ | 74 999 999 ₸ | −1 ₸ |
| 21.08.2026 | ↑ | 75 000 000 ₸ | +10 500 000 ₸ (+16%) |
| 01.06.2026 | ↓ | 64 500 000 ₸ | −1 000 000 ₸ (−2%) |
| 31.05.2026 | ↓ | 65 500 000 ₸ | −2 200 000 ₸ (−3%) |
| 27.05.2026 | ↓ | 67 700 000 ₸ | −1 300 000 ₸ (−2%) |
| 22.05.2026 | ↓ | 69 000 000 ₸ | −1 000 000 ₸ (−1%) |
| 20.05.2026 | ↑ | 70 000 000 ₸ | +3 000 000 ₸ (+4%) |
| 29.04.2026 | ↑ | 67 000 000 ₸ | +1 000 001 ₸ (+2%) |
| 21.04.2026 | ↑ | 65 999 999 ₸ | +1 999 999 ₸ (+3%) |
| 16.04.2026 | ↓ | 64 000 000 ₸ | −1 500 000 ₸ (−2%) |
| 14.04.2026 | ↓ | 65 500 000 ₸ | −499 990 ₸ |
| 11.04.2026 | ↓ | 65 999 990 ₸ | −9 ₸ |
| 03.04.2026 | ↓ | 65 999 999 ₸ | −1 500 001 ₸ (−2%) |
| 01.04.2026 | ↑ | 67 500 000 ₸ | +500 000 ₸ |
| 29.03.2026 | ↑ | 67 000 000 ₸ | +1 500 000 ₸ (+2%) |
| 28.03.2026 | ↓ | 65 500 000 ₸ | −499 999 ₸ |
| 26.03.2026 | ↓ | 65 999 999 ₸ | −1 500 001 ₸ (−2%) |
| 24.03.2026 | ↓ | 67 500 000 ₸ | −499 999 ₸ |
| 18.03.2026 | ↑ | 67 999 999 ₸ | +2 000 000 ₸ (+3%) |
| 17.03.2026 | ↓ | 65 999 999 ₸ | −2 000 000 ₸ (−3%) |
| 05.03.2026 | ↓ | 67 999 999 ₸ | −1 ₸ |
| 05.02.2026 | ↓ | 68 000 000 ₸ | −1 000 000 ₸ (−1%) |
| 22.12.2025 | ↑ | 69 000 000 ₸ | +1 000 001 ₸ (+1%) |
| 12.12.2025 | ↓ | 67 999 999 ₸ | −1 ₸ |
| 11.12.2025 | ↓ | 68 000 000 ₸ | −1 000 000 ₸ (−1%) |
| 10.12.2025 | ↑ | 69 000 000 ₸ | +2 000 000 ₸ (+3%) |
| 09.12.2025 | ↓ | 67 000 000 ₸ | −8 000 000 ₸ (−11%) |
| 05.12.2025 | ↑ | 75 000 000 ₸ | +5 000 001 ₸ (+7%) |
| 04.12.2025 | ↓ | 69 999 999 ₸ | −1 ₸ |
| 28.11.2025 | ↑ | 70 000 000 ₸ | +3 333 334 ₸ (+5%) |
| 22.11.2025 | ↑ | 66 666 666 ₸ | +1 000 000 ₸ (+2%) |
| 19.11.2025 | ↑ | 65 666 666 ₸ | +666 666 ₸ (+1%) |
| 17.11.2025 | 65 000 000 ₸ |